Project not interfere with the already installed security

Project Scope
Statement

The project scope to accurately install Access Control
System (ACS) that will automatically unlock the dormitory doors via an
electronic proximity reader and must with the existing camera system. The
existing security system is designed to face and rotate to record a person as
they use their ID card to unlock
dormitory doors. The system will allow for better security at the school only
allowing in the allowed students and faculty. The new ACS must not interfere
with the already installed security cameras and must completely coincide with
them.

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

 

Tasks

A.    Preparation

1.     
Create the ACS team to complete job tasks

2.     
Survey the college dorm

a.      
Card reader location

b.     
Control panel location

c.      
Existing
security camera locations

3.     
Create the design of the ACS

a.      
Visual design of inside the dormitory

b.     
Visual design
of outside the dormitory

c.      
Visual design of where the security camera face
at the card reader location

4.     
Investigate security system that will be
integrated

a.      
Check camera for proper operation ie. No damage
or wear

b.     
Check the compatibility
with the ACS

B.     Installation

1.      Control
panel

2.      Wires
needed for telecom (RJ45 or RG6)

3.      Readers
on doors mains, side, bedroom, and maintenance

4.      Reposition of the cameras to face the readers

 

C.    
Configuration

1.     
ACS server and software setup for credentials on
proximity reader and access control list.

2.     
Proximity Cards-College dorm must configure
these cards for the student’s access. Most colleges should already have
student’s IDs in file, so just import that information into the ACS server for
the Access Control List. D. Execution

3.     
Transition Period-After Installation and
Configuration, ACS Team will perform  

several test runs on the system before full deployment.

       4.  Soft-Deployment-Test run on the equipment with
Staff members ONLY.

      5.  Announcements-Send emails and correspondences
out to inform students and staff                  

           of the new
Access Control System. Email when explain about the ACS and when  

            access
card will be distributed.

5.     
Full Deployment-Activate ACS and Distribution of
Access Cards